Construction and Fundraising – Week of 3/28/16

Building for Health –Project Update
• Metal stud framing on the second floor is mostly complete, with some sheetrocking underway!
• Electricians are starting to rough in wiring.
• Rooftop drains are being hooked to underground plumbing.
• Two rooftop drains are being relocated.
• Slab-on -grade (floating slab foundation) will be installed soon.

Building for Health –Fundraising Update
$892,000 of $2.2 million goal

Construction and Fundraising Update – Week of 3/7/16

• The slab on the deck of the second floor is scheduled for this week and the interior walls will be installed after the concrete is poured and cured.
• The thermax insulation installation to all exterior walls is complete.
• Tempering the space is in process which will be followed by the start of underground plumbing.
• The roof is near completion and windows should follow in about two weeks.
For the latest construction photos, visit the Photo Gallery.

Building for Health Fundraising Update.
$891,000 of $2.2 million goal.